Nightworks at Riverside Drive, Point Fraser
In preparation for constructing the Causeway Pedestrian and Cyclist Bridges Project, ongoing investigation works will be undertaken on Riverside Drive and Adelaide Terrace at Point Fraser, prior to relocating a key water pipeline.
The works will be undertaken at night, requiring the closure of one westbound (citybound) lane on Riverside Drive and Adelaide Terrace just past the existing Causeway Traffic Bridge. Traffic will be detoured around the work site and traffic management will be put in place.
Riverside Drive and Adelaide Terrace Roadworks
• Monday 24 July 2023
• Nightworks - 8:00pm - 5.00am
• Westbound (citybound) lane closed
• Riverside Drive exit ramp closed
• Speed reduction to 40km/h near the works area
• Eastbound lanes will not be impacted
The reduction in speed and temporary lane closures are necessary to safely undertake the works. Road conditions may be unfamiliar so allow additional time to pass through this area.
Please always proceed with caution and adhere to the speed limit and signage throughout the area. We thank you for your patience and apologise in advance for any disruption or inconvenience.
If you have any questions, please contact 138 138 or email enquiries@mainroads.wa.gov.au