Amendment No. 50 to City Planning Scheme No. 2

Share Amendment No. 50 to City Planning Scheme No. 2 on Facebook Share Amendment No. 50 to City Planning Scheme No. 2 on Twitter Share Amendment No. 50 to City Planning Scheme No. 2 on Linkedin Email Amendment No. 50 to City Planning Scheme No. 2 link

The amendment will establish a Special Control Area (SCA) over Lot 2 (618), Lot 3 (612-616) Hay Street Mall, Lot 4 (69-75), Lot 5 (77-85), Lot 6 (87-93), and Lot 7 (95-99) Barrack Street, Perth. The SCA will allow the site to be treated as one for the purposes of calculating and allocating plot ratio and tenant car parking and introduces site specific provisions to guide the redevelopment of the SCA.

The amendment report (Attachment A) includes details of the proposed SCA location, provisions, site context, and technical analysis.

To integrate the SCA into the existing planning framework, minor amendments to the City Centre Precinct 1-8 Plan Map are required, as detailed in Attachment B.

The consultation period for this amendment has closed. Community consultation was undertaken between 20 October 2023 and 1 December 2023 in accordance with the Planning and Development (Local Planning Schemes) Regulations 2015.

The amendment was adopted by Council at its Ordinary Meeting on 27 February 2024 and has been forwarded to the Western Australian Planning Commission for the Minister for Planning's approval before final gazettal into the City of Perth City Planning Scheme No.2.

A copy of the Ordinary Council Meeting minutes, agenda, and scheme amendment report are available for view on the City’s website.

The amendment will establish a Special Control Area (SCA) over Lot 2 (618), Lot 3 (612-616) Hay Street Mall, Lot 4 (69-75), Lot 5 (77-85), Lot 6 (87-93), and Lot 7 (95-99) Barrack Street, Perth. The SCA will allow the site to be treated as one for the purposes of calculating and allocating plot ratio and tenant car parking and introduces site specific provisions to guide the redevelopment of the SCA.

The amendment report (Attachment A) includes details of the proposed SCA location, provisions, site context, and technical analysis.

To integrate the SCA into the existing planning framework, minor amendments to the City Centre Precinct 1-8 Plan Map are required, as detailed in Attachment B.

The consultation period for this amendment has closed. Community consultation was undertaken between 20 October 2023 and 1 December 2023 in accordance with the Planning and Development (Local Planning Schemes) Regulations 2015.

The amendment was adopted by Council at its Ordinary Meeting on 27 February 2024 and has been forwarded to the Western Australian Planning Commission for the Minister for Planning's approval before final gazettal into the City of Perth City Planning Scheme No.2.

A copy of the Ordinary Council Meeting minutes, agenda, and scheme amendment report are available for view on the City’s website.

  • CLOSED: This survey has concluded.

    Closed 4pm Friday 1st December 2023


    Complete Form
    Share Amendment No. 50 to City Planning Scheme No. 2 – New proposed Special Control Area on Barrack Street, Perth on Facebook Share Amendment No. 50 to City Planning Scheme No. 2 – New proposed Special Control Area on Barrack Street, Perth on Twitter Share Amendment No. 50 to City Planning Scheme No. 2 – New proposed Special Control Area on Barrack Street, Perth on Linkedin Email Amendment No. 50 to City Planning Scheme No. 2 – New proposed Special Control Area on Barrack Street, Perth link
Page last updated: 20 Mar 2024, 02:30 PM